3P5 Industrial Engineering Lecture 1-2: Method of Study

文章目录

  • 3P5 Industrial Engineering Lecture 1-2: Method of Study
      • Course Intro
      • Bio
      • Industrial Engineering
      • Outline
      • Course Information
      • Supporting sources
    • Method of study introduction
      • Questions to ponder
      • Objectives
      • The nature of work
      • Work study
      • Method study
      • Typical Objectives of method study
      • Method study procedure
      • SELECT
      • Record
      • Operation charts
      • Operation chart for subassembly
      • Process maps (better for Veronica)
      • Cross-functional process Map (difference between sequence diagram: similiar)
      • Recording sequence- process charts
      • Flow process chart
      • Process chart for consisting of several machining operations
      • a flow process chart one handed
      • Two handed process chart
      • Activity charts
      • Shading formats for activity chart
      • Example of activity chart
    • chart
      • Right hand-left hand activity chart
      • Multiple activity chart
      • Example of multiple activity chart
      • Layout chart, String diagrams
      • String diagrams example
    • Examine, develop and define
      • Examine
      • Examine: systematic questioning
      • Second stage of questionsing
      • Develop
      • use of human body (12 basic principles)
      • Classifications of hand and arm motions
      • Arrangement of workplace
      • Design of tools and equipment
      • Define
      • Standard Operating procedure
      • Standard operating procedure
      • How is it reviewed and why is it revised?
    • Install and maintain
      • Install
      • Maintain
    • Conclusion
    • Q
    • Where three categories?

Course Intro

Bio

  • Digital Built Britain at Cambridge
  • Type of operations for making on technologies to make profit
  • Based on the layout to make profits
  • Technology is not the problem
    • How to make the technology to generate the real values for the customers
  • Production process
    • to make the customers happy
  • Research projects
    • emerging technologies in sustainable systems
    • wearable health care

Industrial Engineering

  • design

  • improvement

  • installation

    • of intergated systems
  • components

    • men
    • materials
    • equipments
  • Knowledge and skills

    • math
    • physical
    • social

Outline

  • Method study

    • how a process can be studied and improved
  • Ergonomics
    • how to make a process human friendly
  • Lean manufacturing
    • how to identify and reduce wastes
  • Supervision 1
  • Work measurement 1
    • how to measure time and effort in operations
  • work measurement 2
    • Ditto
  • factory layout planning
    • how to measure how good a layout is
  • supervision 2
  • Reliability engineering
    • how to measure equipment failures
  • maintenance planning
    • how to improve reliability of operations

Course Information

  • 3 supervisions ? to be confirmed

    • 1 Jan 24- Feb 7
    • 2 Feb 02- Feb 21
    • 3 Feb 28- Mar 14
  • supervisor
    • Frans
    • Dequn
  • exam
    • paper 3 (joint paper with 3p4)
    • 2 questions from 3p4 and 3p5
  • coursework
    • production game (with 3p4)
  • Core text
    • Groove, mp “work systems: the methods, measurement and management of work”, pearson, 2014

Supporting sources

  • Emma
  • Charlottoe

Method of study introduction

Questions to ponder

  • systematically study the way

    • factors

      • manufacuring operations
    • Questions
      • what should we study?
      • how can we record the operations?
      • what questions should we ask?
  • Improve?
    • Fundamental principles of motion economy?

      • Motion economy is the process of minimizing the physical and perceptual loads imposed on people engaged in any type of work, whether it be in the office, the shop floor, the kitchen, or at the driving wheel.
      • 运动经济是**将从事任何类型工作的人的身体和感知负荷降到最低的过程,无论是在办公室、车间、厨房,还是在驾驶室。
      • how they are working
      • what are their pattern
      • what is the level of the music
      • Symbol of everybody’s working

Objectives

  • procedure for doing method study
  • techniques used for recording industrial operations
  • the principles of motion economy for working plance design

The nature of work

  • work’s define

    • activity

      • person

        • Uses physical
        • mental efforst
          • accomplish

            • a given task
          • perform a
            • Duty
  • the pyramidal structure of work
    • task
    • work element
    • basic motion elements
  • macro vision of the working domain
  • economics
  • Employee working for you
  • making them comfortable on working domain
  • put them in the domain about their basic motions

Work study

  • work study

    • Method study

      • methods analysis
      • methods design
    • work measurement
      • time study
      • PMTS
        • A predetermined motion time system is frequently used to perform Labor Minute Costing in order to set piece-rates, wage-rates and/or incentives in labor oriented industries by quantifying the amount of time required to perform specific tasks under defined conditions. Wikipedia
        • 预先确定的运动时间系统经常被用来进行劳动分钟成本计算,以便通过量化在规定条件下执行特定任务所需的时间来确定计件工资、工资率和/或劳动力导向型行业的奖励。维基百科
      • Working sampling
      • MTM
        • ?

Method study

  • systematic recording and critical examination of existing and proposed way of doing work

    • means of

      • designing
      • developing
      • applying
        • easier and more effective methods
        • reducing costs
  • other terms
    • methods engineering
    • work simplification
    • Process re-engineering
    • business process re-engineering

Typical Objectives of method study

  • increase productivity and efficiency

  • reduce cycle time

  • reduce product cost

  • reduce labour content

  • improve customer satisfaction

  • improve product and service quality

  • reduce lead times and improve work flow

  • Increase flexibility of work system

  • apply more ergonomic work methods

    • 人机工程学
    • Human factors and ergonomics (commonly referred to as human factors) is the application of psychological and physiological principles to the engineering and design of products, processes, and systems. The goal of human factors is to reduce human error, increase productivity, and enhance safety, system availability and comfort with a specific focus on the interaction between the human and the engineering system.[1]
  • improve worker safety

  • enhance the environment

    • inside
    • Outside the factory

Method study procedure

  • SELECT

    • the work to be studied
  • RECORD
    • all the relevant facts about the present method by direct observation

  • EXAMINE

    • those facts critically and in ordered sequence
  • DEVELOP
    • the most practical economic and effective method
  • DEFINE
    • the new method so that it can always be identified

  • INSTALL

    • that method as standard practice
  • MAINTAIN
    • stadard practice by regular checks
  • What is the abstractions for the three layers
    • prepare
    • design
    • Implement

SELECT

  • selections main criterias (main 3)

    • bottlenecks

      • whole
    • Labour intensive operations
    • operations with high scrap or wastage
      • where there is more scraps
      • there will be a room for improvement
  • Other criterias
    • movement over long distances
    • repectitive operations
    • Prior to automatition
      • when you have an automation
      • try to see whether the automation machines can come into play
    • work with health and safety concerns

Record

  • Record

    • sequence

      • operation chart
      • process charts
    • times
      • multiple activity charts
    • position and movement
      • layouts
      • string diagrams
  • Diagrams, charts and pictorial methods are widely used

Operation charts

  • Processing and assembly operations

    • changing the shape
    • joining two or more parts to form an assembly
  • Inspection operations
    • checking the materials

Operation chart for subassembly

  • Bracket
  • frame motor
  • power cord

Process maps (better for Veronica)

  • detailed picture of process or system
  • symbols
    • beginning
    • Task or activity step
    • decision point
  • [外链图片转存失败,源站可能有防盗链机制,建议将图片保存下来直接上传(img-FAHLu99h-1646153113883)(/Users/top1/Library/Application%20Support/typora-user-images/image-20220124114335440.png)]

Cross-functional process Map (difference between sequence diagram: similiar)

  • High level view

Recording sequence- process charts

  • graphical and symbolic representation

    • of the processing activities performed

      • on something or by some one
  • Types

    • materials

      • material analysis
    • worker process chart
    • form process chart

Flow process chart

  • Operation

    • processing of a material
  • Inspections
    • check for quality or quantity
  • Move
    • transport of material to new location
    • time factors should be in
  • Delay
    • material are waiting to be processed or moved
  • Storage
    • keep materials in a protected location

Process chart for consisting of several machining operations

a flow process chart one handed

Two handed process chart

  • operator at a work station
  • movement of both hands are charted individually and to a greater level of detail
  • normal process chart
  • MTM
    • method time measure
  • Operation factors
    • operation
    • trasnport
    • delay
    • Storage
  • Micro-motion study

Activity charts

  • how much time is spent on each activity
  • type of charts
    • activity chart

      • right hand / left-hand activity chart

        • Workplace activity chart
    • Worker-machine activity chart
    • Worker-multimachine activity chart
    • gang activiy chart
      • Aka multiworker activity chart

Shading formats for activity chart

  • Shading

    • black
    • grey
    • white
    • Diagonal lines
    • horizontal lines
  • colour
    • blue
    • yellow
    • white
    • green
    • Red
  • Activity
    • operation
    • insepction
    • idle
    • moving
    • Holding

Example of activity chart

  • Activity description

    • Pick up plate tote pan
    • carry plate to drill press and load
    • activate press
  • chart

  • activity time (min)
  • Cumulative time

Right hand-left hand activity chart

  • left hand

    • pick up board
    • hold board
    • hold board
    • put assembly in tote pan
  • time (min)
    • 0.08
    • 0.06
  • right hand
    • pick up peg
  • cummulative time (min)
    • 0.08

Multiple activity chart

  • activities of more than one subject

    • worker
    • machine
    • Item of equipment
  • each subject are recorded on a seperate bar or column
  • useful for analyzing and improving operations
    • number of interrelated activities
  • Short-cycle operations where an operator is interfacing with one or more mechanical devices

Example of multiple activity chart

  • Chart

    • One worker operating more than one machines
    • Worker
    • time
    • machine 1
    • time
    • machine 2
    • time
    • cumulative time (min)
  • No two machines should be idle at the same time

Layout chart, String diagrams

  • showing movements plotted on a scale drawing
  • excellent of getting to grips with a complex layout
  • transportation of the materials for visualizing the layout

String diagrams example

  • before

    • Rivet
    • Cut
    • Fold
    • Sheet metal
    • Stack
    • Drill
    • Check
    • Mark
  • After
    • fold

Examine, develop and define

Examine

  • two categories

    • happening to material

      • make ready

        • Prepare the materials
        • work and set it in position ready to be worked on
      • do
        • operations where transformation is made to the materials
      • put away
    • Materials is not being touched
  • eXAMINE TOOLS

    • Eliminating
    • Combining
    • Rearranging
    • Simplifying
  • Systematic questioning techniques

    • purpose

      • undertaken activity
    • place
      • undertaken activity
    • sequence
      • undertaken activity
    • person
      • undertaken activity
    • Means
      • undertaken activity

Examine: systematic questioning

  • purpose

    • what is actually done?
    • what is achieved>?
    • Why is the activity necessary at all?
  • Place, sequence and person
    • were is it being done?
    • when is it done?
    • who is doing it?
  • Means
    • why is it being done in that approach

Second stage of questionsing

  • What should be done?
  • When should it be done?

Develop

  • Most practical, economic and effective method

  • Principles of Motion Economy

    • Maximise efficiency and minimize fatique

      • use of human body
      • design of the workplace
      • design of tools and equipment

use of human body (12 basic principles)

  • basic five

    • both hands should be fully utilised
    • two hands should begin and complete their movements at the same time
    • motions of the arms should be symmetrical and in opposite directions and should be made simultaneously
    • the work should be designed to emphasise the worker’s preferred hand
    • two hands should not be idle at the same time except during the period of rest
  • laws of physics to assist in the use of hands and arms while working

    • continuous curved movements are better than straight-line motions
    • Momentum should be employed to help the worker, but should be reduced to the minimum whenever it has to be overcome by muscular effort
    • advantage of gravity instead of opposing it
    • Rhythm is essential to Smooth and automatic performance of a repetitive operation
      • the work should be arranged to permit esay and natural rhythm whenever possible
    • hand and body motions should be made at the lowest classification at which it is possible to do the work satisfactorily
  • Recommendations for using body members other than the hands and arms

    • method should be designed to utilise the worker’s feet and legs when appropriate
    • work should be arranged so that eye movements are confined to a comfortable area, without the need of others

Classifications of hand and arm motions

  • 1

    • finger motions only
  • 2
    • finger and wrist motions
  • 3
    • Finger, wrist and forearm motions
  • 4
    • Finger, wrist , forearm, and upper arm motions
  • 5
    • finger, wrist, forearm, upper arm, and shoulder motions

Arrangement of workplace

  • habit formation
  • pre-positioned
  • Gravity feed
  • normal work area
  • maximum work area
  • adaquate seat position

Design of tools and equipment

  • Hands should be relieved of all work
  • Two or more tools should be combined whenever possible
  • hands should be relieved of work
    • can be performed by feet
  • Multiple tools together

Define

  • new method so that it can always be identified
  • having developed the improved method it is then necessary to define it
  • Standard Operating procedure (SOP)
  • Procedure
  • Tools
  • Layout
  • Checks
  • Set-up information

Standard Operating procedure

  • ensure the tasks are always performed in the same way

    • reduce variations in operation time
    • reduce variations in quality
    • provide a basis for training new operators
    • allow variations to be easily identified
    • form a fixed basis for further improvement
    • important for auditing, ISO, British Standard

Standard operating procedure

  • Purpose
  • required PPE
  • Potential Hazards
  • Reference documents
  • APS
  • Steps
  • Key points
  • Page
  • Version number
  • Document Number

How is it reviewed and why is it revised?

  • revisement report

Install and maintain

Install

  • As standard practice

Maintain

  • Standard practice by regular basic

Conclusion

  • Know the life cycle of the opeartion
  • improve

Q

  • Where can we get the slides?
  • Where can I have the supervision papers?
    • Questions 1-3 from examples Paper 1
  • Where three categories?

3P5 Industrial Engineering Lecture 1-2: Method of Study相关推荐

  1. wf 《计算机专业英语》,IE(Industrial Engineer)专业英语

    Facilities Design and Planning设施规划与设计 Material Flow System Analysis物流系统分析 Production Planning and Co ...

  2. 计算机辅助工程技术应用的说明报告,计算机辅助工程技术(cae)(Computer Aided Engineering (CAE)).doc...

    计算机辅助工程技术(cae)(Computer Aided Engineering (CAE)) 计算机辅助工程技术(cae)(Computer Aided Engineering (CAE)) In ...

  3. Something about Software Engineering

    文章目录 软件工程 定义 Definition 软件危机 Software Crisis 软件生命周期 软件工程知识体系 SWEBoK(Software Engineering Body of Kno ...

  4. 面试英语自我介绍的常用词汇

    面试英语自我介绍的常用词汇 面试英语自我介绍的常用词汇 Words & Expressions&范文 精华汇总贴 想 找一份满意的工作吗?面试中面对外国老板连珠炮似的提问,有没有觉得心 ...

  5. 面试时英语自我介绍范文

    本文转载自: https://www.cnblogs.com/flyingmouse/archive/2006/06/10/422499.html 作者:Flyingmouse 转载请注明该声明. 英 ...

  6. [面试]英文面试问答

    [面试]英文面试问答 转载于:http://www.cppblog.com/finehai/archive/2009/07/18/90455.html 目前,随着新一轮大学毕业生求职高峰的到来,备战英 ...

  7. 英语自我介绍资料及范文

    英语面试一般包括三轮 chie介绍说,第一轮面试一般由公司人力资源部的人员担任考官,他们会从你的个人简历出发,询问一些有关个人的问题,比如请你用英语做一个自我介绍.有些公司也会有一部分英语笔试,主要考 ...

  8. 【情景英语】英语自我介绍资料及范文

    我手上还有一部分面试资料,鉴于版面关系,就不一一贴出,有需要的朋友请 登陆 xiaren1@163.com ,用户名:xiaren1,密码xiaren123.请不要更改密码,登陆不上的请多试几遍,谢谢 ...

  9. 对偶理论,敏感性分析(方述诚 笔记4

    Lecture 5    Duality and Sensitivity Analysis 本讲内容: dual    LP问题的背面, 对偶变数.对偶约束. 对偶理论:对偶问题和原问题如何相连,  ...

最新文章

  1. [译]Node v5.0.0 (Stable)
  2. DNS服务搭建和正反区域解析
  3. BZOJ-1492-货币兑换cash-NOI2007-CDQ分治
  4. 常见的保险种类,险种分类介绍
  5. Vue中的 ref 和 $refs
  6. react.js从入门到精通(一)
  7. 埃及分数The Rotation Game骑士精神——IDA*
  8. js计算排名_今天,我们讲一下,快速排名与黑帽SEO
  9. linux网卡为啥叫ens160这些,centos8将网卡名ens160修改为eth0
  10. Android studio实现财务记账系统软件android studio开发课程设计
  11. 阿里巴巴Java开发手册详细版本
  12. 短消息代理(cmpp20 smproxy)要怎么创建java项目_基于华为smproxy开发的cmpp3
  13. UI设计新手该怎么求职 有没有UI面试必备攻略
  14. Lazada商家售出产品多久能收款?收款方式及流程一篇详解!
  15. python windows api截图_Python调用windows API实现屏幕截图
  16. 系统安全性之认证技术
  17. EChat(简易聊天项目)七、保存聊天记录
  18. 错误记录----javac错误:javac不是内部或外部命令 也不是可运行的程序
  19. 点阵屏HCMS-3977驱动
  20. linux多字节错误,在Linux中解压缩时遇到多字节字符的问题

热门文章

  1. ajax-loader.gif不存在怎么解决_女生恋爱技巧:恋人吵架怎么办?
  2. 66319d电源使用说明书_你用对电暖器了吗?冬季使用家电应该注意这四点
  3. linux c 图像处理,基于uClinux的图像处理及Socket传输的实现-计算机应用与软件.PDF...
  4. HDD与OS的江湖恩怨
  5. 根据文件路径检测文件大小并检测是否正在被占用
  6. Windows中将文件压缩成linux支持的tar.gz格式的压缩包
  7. Winform中自定义添加ZedGraph右键实现设置所有Y轴刻度的上下限
  8. mysql 存储过程 嵌套if_mysql存储过程if嵌套if的写法
  9. 用Delphi开发OPC客户端工具的方法研究
  10. linux安全配置-将ssh服务隐藏于Internet(端口碰撞)