实际价格计算:确定方法

定义

Indicator controlling which price calculation method is used for anactivity type.

There are three methods by which prices can be calculated:

1 Price per period

The costs incurred in one period are divided by the activities for theperiod. This may result in different prices for each period. Givenidentical fixed costs but different activity quantities, a relativelyhigh price is therefore used to value the activity quantities in periodswith a low activity quantity. By contrast, in those periods with lowactivity input, the activity input is valuated at a relatively lowprice, because the fixed costs relate to a higher activity quantity.

Example

Per.| Var. Costs | Fixed Costs | Activity |   Period. Price
1 | 1.000 EUR | 1.000 EUR | 1.000 h | 2.000 EUR/1.000h =   2 EUR/h
1 | 1.000 EUR | 1.000 EUR | 1.000 h | 2.000 EUR/1.000h =   2 EUR/h
2 | 100 EUR | 1.000 EUR |   100 h | 1.100 EUR/100 h=   11 EUR/h

The activity receivers in period 2 are charged more than the receiversin period 1. The price per period is higher in period 2 than in period 1due to the lower variable costs in period 2. In this period (2), thefixed costs are distributed among a lower activity quantity.Accordingly, the price in period 2 contains a higher fixed percentagethan that in period 1.

2 Average price

All receivers are charged the same price irrespective of the period inwhich they receive the activity.

The total costs of all periods are divided by the totalactivities (for one activity type) for all periods.

Example

Per.| Var. Costs | Fixed Costs | Activity | Average Price
1 | 1.000 EUR | 1.000 EUR | 1.000 h | not determined
2 |   100 EUR | 1.000 EUR |   100 h | not determined
Total| 1.100 EUR | 2.000 EUR | 1.100 h | 3.100 EUR/1.100 h = 2,82 EUR/h
  • Under this method, the balance for the individual periods does not equalzero, meaning that either:
  • Too much (see period 1 where 1000 h x 2.82 EUR/h = 2820 EUR ) or
  • Too little (see period 2 where 100 h x 2.82 EUR/h = 282 EUR)

is charged.

3 Cumulative price (only possible in the actual)

Under cumulative calculation, the price for a period is the total of thecosts and activities for all periods up to the period underconsideration (your entry in the To Period field). This methodsmoothes out cost fluctuations between periods.

During revaluation under the cumulative method, all those sender objects(in those periods that you specified under period selection for actualprice calculation) are credited in full. The activity inputs arevaluated with the new price in each selected period. The system makesthe necessary additional postings in these periods to ensure this equalvaluation.

The cumulative procedure is only possible where all activity receiversin all periods of the interval entered can be posted to. In other words,the period lock must not be active for these objects. You must ensurethat this is the case because receivers in the first period can containequalization postings in the final period.

Example 1: Differences between prices per period and cumulated price

Prices per period: The costs of each period are divided by theactivities in question - the prices can vary markedly.

Per.| Costs per. | Activity per. | Price per per.
1 | 1.000 EUR | 100 h | 10 EUR/h
2 | 2.000 EUR | 50 h | 40 EUR/h
3 | 1.000 EUR | 250 h | 4 EUR/h

Cumulative price: The price is determined from the total of the currentperiods and of the previous periods. For example, the price of period 2is calculated by adding the costs in periods 1 and 2 (1,000 + 2,000 EUR)and dividing them by the activities for this period (100 + 50). Theprices do not fluctuate as much.

Per.| Cum. Costs | Cum. Activity. | Cum. price
1 | 1.000 EUR | 100 h | 10 EUR/h
2 | 3.000 EUR | 150 h | 20 EUR/h
3 | 4.000 EUR | 400 h | 10 EUR/h

Example 2: Revaluation at actual prices

Under revaluation, activity allocations are valuated at actual pricesand the difference as against the values already posted is allocatedsubsequently.

If, under actual price calculation, you enter a range of periods, thesystem carries out revaluation for every period. The sender objects arefully credited in each period.

If you enter one period only, the subsequent allocation is carried outin this period only, meaning that only this period is fully credited.

Entry: Periods 1 through 3

Per.| Act.costs | Activity | Cum. Actual Price | Plan Costs | PlanPrice
1 | 1.000 EUR | 100 h | 10 EUR/h |   500 EUR | 5 EUR/h
2 | 3.000 EUR | 150 h | 20 EUR/h |   750 EUR | 5 EUR/h
3 | 4.000 EUR | 400 h | 10 EUR/h | 2.000 EUR | 5 EUR/h
Per.| Difference Plan/Actual Costs| Revaluation
1 |   500 EUR | +   500 EUR
2 | 2.250 EUR | + 1.250 EUR
3 | 2.000 EUR | - 1.000 EUR

Period 1:

The difference between actual and planned costs is 500 EUR. Allreceivers are charged this amount - the sender objects in period 1 arecredited in full.

Period 2:

The difference between plan and actual costs amounts to 2,250 EUR. Sincecumulative values are used in calculation here, the receiver objects arecharged 1,250 EUR. The sender objects are still fully credited because 1,000 EUR from the first period have already been allocated to thereceiver.

Period 3:

The revaluation results in the receivers being charged 1,000 EUR toomuch. This amount is credited to the receivers - the sender objects arethen credited correctly and in full. How is this total arrived at? Thedifference between planned and actual costs is 2,000 EUR. In periods 1and 2, the receivers were charged 1,250 EUR planned costs and 1,750 EURrevaluation, making a total of 3,000 EUR. The difference between planand actual, however, is only 2,000 EUR  - the receivers have beencharged 1,000 EUR too much.

Entry: Periods 3 to 3

If, under actual price calculation, you enter period 3 only, the systemallocates correctly, but senders are fully credited only in this period.The price calculation program posts only to the period(s) that you enterunder From/To Period. 750 EUR is revaluated because although plancosts of periods 1 to 3 are included in the calculation (3,250 EUR), norevaluation took place in periods 1 and 2.

Per.| Actual Costs | Activity | Cum. Actual Price | Plan Costs | Plan Price
3 | 4.000 EUR | 400 h | 10 EUR/h | 2.000 EUR | 5 EUR/h
Per.| Difference Plan/Actual Costs | Revaluation
3 | 2.000 EUR | + 750 EUR

Unlike an average price, which can be defined for either single costcenters/activity types or for a business process, cumulative calculationcan be selected for all sender objects (under version settings).

The cumulative method is advantageous where costs incurred or theactivity output are subject to large fluctuations. This applies inparticular if costs are not incurred at the same time as activity isoutput. The advantage of the cumulative price over the average price(which also ensures an equal debiting of receivers) lies in the factthat it ensures full crediting of the cost center or business process atany point. Under average calculation by contrast, full crediting ispossible only for the entire period.

相关

在内部作业分配的重过帐过程中,可以在另一个期间内过帐重过帐。在这种情况中,由于在旧的接收方和发送方之间的负作业流,可能存在一个旧接收方的负数量。

在期间外的内部作业分配重过帐中,因此应该使用累计作业价格,因为一个不同的作业价格计算会导致不准确的结果。

实际价格计算:确定方法相关推荐

  1. Octopus系列之更新历史记录

    更新笔记历史 2015.2.3 更新了产品价格的计算方法     --采用了通用化的一个处理[支持各个国家货币] 更新产品价格,增加两组价格:一组用来进行前台的展示:一组用来进行后台的计算 更新了产品 ...

  2. 在 Oracle Enterprise Linux 和 iSCSI 上构建您自己的 Oracle RAC 11g 集群

    作者:Jeffrey Hunter 了解如何以低于 2,700 美元的费用在 Oracle Enterprise Linux 上安装并配置 Oracle RAC 11g 第 2 版开发集群. 本指南中 ...

  3. Java面试题大全2021版

    一.Java 基础 JDK 和 JRE 有什么区别? JDK:Java Development Kit 的简称,java 开发工具包,提供了 java 的开发环境和运行环境. JRE:Java Run ...

  4. Magento购物车价格计算的功能实现之代码理解

    为什么80%的码农都做不了架构师?>>>    一.代码流程: 1.Mage_Sales_Model_Quote::collectTotals();     图1-001 Mage_ ...

  5. 简化存货核算方法和物料分类帐对比

    为了简化成本核算,可使用毛利率法和零售价法(主要用于商品流通企业,亦用于制造企业). 一.毛利率法. 毛利法是根据本期销售净额乘以上期实际毛利率(或本期计划毛利率)计算出本期销售毛利,并据以计算发出存 ...

  6. php数字两位小数_PHP保留两位小数的几种方法

    代码如下所示: $num = 10.4567; //第一种:利用round()对浮点数进行四舍五入 echo round($num,2); //10.46 //第二种:利用sprintf格式化字符串 ...

  7. 函数传参之商品价格计算—JS学习笔记2015-6-6(第50天)

    经常我们可以看到很多网站会有多个相同功能的模块,比如淘宝首页的轮播,比如新浪首页的tab切换: 那么可以看出这些地方在HTML结构上是类似的,所以我们可以考虑用一块功能代码去实现,而不同是仅仅是传递参 ...

  8. 关于代码效率提升的方法心路历程(购物车)

    关于代码效率提升的方法心路历程(购物车) 给为园友们,大家好,最近一直解决执行提速,分析老代码的逻辑并提出优化方案,在这个过程中发现了很多不好的习惯,导致很多程序逻辑执行效率低下,现在将其总结一下,如 ...

  9. 用户故事拆分方法总结

    如何拆分用户故事 一.用户故事的定义 二.拆分用户故事的目的 三.用户故事拆分原则 四.用户故事拆分方法 1.工作流 2.操作 3.业务规则 4.数据 5.用户界面 6.主要工作 7.简单复杂 8.性 ...

最新文章

  1. Hulu视频如何提升推荐多样性?
  2. 新装iis 页面503错误 DefaultAppPool停止解决方案
  3. 浅析SAP EWM与WMS的差异
  4. 解决HDFS NameNode启动时Loading edits时间超长的问题(NameNode数据同步机制介绍)
  5. 矩阵树 Matrix-Tree 定理实现模板(高斯消元求解行列式)
  6. 卷积神经网络CNN要点:CNN结构、采样层、全连接层、Zero-padding、激活函数及Dropout
  7. 则执行C语言语句unsigned,部分C语言题目
  8. 新浪微博2-找到用户的accessToken
  9. (翻译)Google Guava Cache
  10. scATAC-seq建库原理,质控方法和新R包Signac的使用
  11. Color Cube – 国产的优秀配色取色工具
  12. Java成神之路——一文搞懂CAS
  13. 第2章 算法1---《大话数据结构》读书笔记
  14. Collectors.mapping()
  15. html5控制gif速度,用gifsicle优化GIF动图
  16. PLSQL代码调试Oracle dbms_utility返回错误
  17. 平面解析几何----焦点弦上焦半径长度之比公式
  18. Ionic3.x 创建项目中的问题-IonIC start myApp tabs
  19. Android 读取本地txt文件中的内容
  20. java.security.InvalidKeyException:illegal Key Size 报错解决

热门文章

  1. ubuntu11.10+git+svn works
  2. Unity3D正常行走和飞行的实现
  3. 关于fckEditor的功能配置-PHP版
  4. PEOPEO飘飘人项目总监胡实:项目经理进阶指南
  5. PMCAFF“音乐+社交”产品马拉松大赛圆满结束,10支队伍大放异彩
  6. kubernetes dashboard backend源码剖析
  7. 获得WebBrowser中的图片数据
  8. 利用原生js 如何实现div移动?
  9. 让改变输入法回车键的图标
  10. CCNA综合实验配置