Primavera P6 EPPM 21.12.X Patch/Update(补丁/更新)
目录
目录
Patch 21.12.10.0
Patch 21.12.9.0
Patch 21.12.8.0
Patch 21.12.7.0
Patch 21.12.6.0
Patch 21.12.5.0
Patch 21.12.4.0
Patch 21.12.3.0
Patch 21.12.2.0
Patch 21.12.1.0
了解本文内容前,可以先读之前的关于patch的文章,希望可以给你带来帮助
Oracle Primavera P6 & Unifier等产品 Patch 补丁介绍_蚕豆哥的博客-CSDN博客常有一些P6,PU用户向我咨询关于产品的功能问题,有些是本身的缺陷,经过了解得发现大多数这些用户安装的这些产品版本都是初始版,也就是从未打过补丁或更新的0版,典型如18.8.0.0,19.12.0.0,20.12.0.0,21.12.0.0https://campin.blog.csdn.net/article/details/123149918
截至本文更新时,P6 21.12版本补丁已更新到 21.12.10.0
以下内容纯干货,全部摘自于ORACLE服务支持网站 Oracle Support, 涉及的内容也全为原版英文,需要的朋友可以找工具翻译,内容不包含对应的具体patch(补丁更新)文件
Patch 21.12.10.0
21.12.10.0 | WEB | 34630900 | ERROR 'FAILED SAVING ACTIVITY DATA. ACTUALFINISH MUST BE LATER THAN RESUMEDATE.' WHEN CHANGING ACTUAL FINISH IN COLUMN |
34565153 | CANNOT CREATE OR CHANGE BAR LABELS IN THE VIEW SETTINGS | ||
34561197 | INTERNAL FP - SEARCH AND REPLACE (GLOBAL CHANGE) IN P6 WEB FAILS WHEN CHANGING THE ACTIVITY CODE | ||
TM | 34599473 | TM ACTIVITY STATUS ERROR - ERROR WHILE TRYING TO PERFORM UPDATE: FOR INPUT STRING: NULL | |
34578352 | 21.12.9.0 - APPROVALS - GETTING SAME MESSAGE MULTIPLE TIMES SOME OF THE TIMESHEETS HAVE BEEN WITHDRAWN .CLICK TO REFRESH | ||
34574698 | FP-BUG 34566263 - TM WEB IS NOT GETTING DATA FROM CHGTASK TABLE WHEN ACTIVITY IS DISPLAYED USING TM FILTER | ||
SRVS | 34633978 | SECURE CODES NOT COPIED WHEN COPYING WBS FROM TEMPLATE USING P6 WEB SERVICES | |
34601657 | FP - PUBLISH ENTERPRISE DATA TIMES OUT ON ACTIVITYCODE STEP 21 -21.12.X | ||
34598822 | ASSIGNMENT SECURE CODES NOT COPIED WHEN COPYING PROJECT USING P6 WEB SERVICES | ||
34580718 | SECURE CODES NOT COPIED WHEN COPYING PROJECT USING P6 WEB SERVICES | ||
P6PRO | 34644900 | EEQEO-1062-8 AND ORA-1756 WHEN SELECTING A CUSTOM PORTFOLIO | |
34609064 | VISUALIZER DOES NOT DISPLAY ACTIVITIES IN GANTT WHEN FILTERING BY INDICATOR UDF | ||
34607374 | OPTIMIZE ROW HEIGHT NOT APPLIED OPENING PROJECT AFTER PRINTING PREVIOUS PROJECT | ||
34575783 | ASCENDING/DESCENDING ICONS ARE REVERSED WHEN SORTING A COLUMN | ||
34461169 | ERROR: WBS CODE SEPARATOR MUST NOT CONTAIN NON-PRINTING CHARACTERS WHEN CHANGING CODE SEPARATOR BACK TO PERIOD | ||
34629267 | GOT TOKEN CREATED SUCCESSFULLY MESSSAGE AND UNABLE TO LOGIN P6 PROFESSIONAL AFTER UPGRADED TO 22.9 |
Patch 21.12.9.0
21.12.9.0 | WEB | 34506973 | ERROR UNCAUGHT RANGEERROR: MAXIMUM CALL STACK SIZE EXCEEDED SAVING VIEW GROUPING FROM NONE TO ANY CODE TYPE |
34314119 | ADDING BASELINE DOES NOT AUTOMATICALLY CHECK THE PUBLISH BOX | ||
TM | 34546803 | FP BUG 34472549 - P6 TEAM MEMBER WEB CUTTING OFF PROJECT NAME AT SPACE CHARACTER | |
SRVS | 34546720 | FP-P6 WEB SERVICE CALL PROJECTEXPORT RETURNS GENERIC ERROR CODE 0 | |
INTG | 34478665 | WHEN LOADING DRIVING FIELD USING P6 REST API RELATIONSHIP TASK ERROR THE DRIVING FIELD MUST BE SPECIFIED | |
P6PRO | 34551596 | OLDER WEBVIEW2 VERSION (EXAMPLE, 92.0.902.73) PREVENTING P6 PROFESSIONAL LOGIN USING CLOUD CONNECT & SSO | |
34551584 | WEBVIEW2 CAUSING P6 PROFESSIONAL SSO EMBEDDED BROWSER TO PROMPT FOR USER AUTHENTICATION WITH INTEGRATED WINDOWS AUTHENTICATION (IWA) PROVIDERS | ||
34542098 | WBS CUT/PASTE, COPY/PASTE, DRAG/DROP PERFORMANCE DEGRADATION WHILE EXECUTING INDIVIDUAL RSRCHOUR UPDATE STATEMENTS USING CLOUD CONNECT [CACHE OFF] | ||
34505777 | OPTIMIZE HEIGHT BY ROW CONTENT NOT DISPLAYING ALL TEXT | ||
34504126 | DATA NOT POPULATING AFTER REFRESHING DATA VIA ALT+SHIFT+F5 | ||
33190221 | P6 WEB GLOBAL FILTERED PORTFOLIOS NOT REFRESHING | ||
34502460 | THE NAME OF COLUMN IS CHANGED AUTOMATICALLY EVEN WITH NO USE. | ||
34490704 | PRINT PREVIEW IN P6 PROFESSIONAL 19.12.10 SHOWS LARGER FONT SIZES UNTIL ZOOMED IN | ||
34466712 | PROJECT SHOWS MATCH IN THE XER IMPORT WIZARD WHILE THE PROJECT DOES NOT EXIST IN THE P6 DB | ||
34404874 | XER EXPORT: NO MAPPING FOR THE UNICODE CHARACTER EXISTS IN THE TARGET MULTI-BYTE CODE PAGE | ||
34376968 | TIME CHANGES FROM WHAT WAS ENTERED WHEN ENTERING A DATE MANUALLY | ||
34274755 | TIME IS DISPLAYED TILL WE REFRESH FOR CERTAIN DATE FIELDS IN ACTIVITIES VIEW AND PROJECTS VIEW DETAILS | ||
34261248 | COPY FINISH DATE INTO EXPECTED FINISH DATE IS NOT WORKING IN PVD | ||
33313511 | IN P6 PRO USERS ENCOUNTERING REPEATED AND DISRUPTIVE, INTERMITTENT EVENT CODE ERRORS WHILE WORKING IN ACTIVITIES PAGE AND OPENING AND OR SWITCHING TO DIFFERENT ACTIVITIES LAYOUTS | ||
34503681 | FP- UPDATE BASELINE IS NOT UPDATING RESOURCE ASSIGNMENT UDFS WHEN USING FILTER |
Patch 21.12.8.0
21.12.8.0 | WEB | 34446079 | 21 FP - PRE2012: WHEN WE REMOVE FEW COLUMNS WHILE CREATING NEW VIEW , THE CHANGES ARE NOT REFLECTED IN DB. |
34435672 | RESOURCE ASSIGNMENTS VIEW DOES NOT LOAD | ||
34402637 | UNABLE TO PATCH P6 APPLICATION TO 20.12.14 FROM 20.12.13. OUI-10022:THE TARGET AREA /U01/APP/ORAINVENTORY CANNOT BE USED BECAUSE IT IS IN AN INVALID STATE | ||
34387865 | [WCCC ONLY] DOCUMENTS TAKE A LONG TIME TO OPEN WHEN HUNDREDS OF MATCHING 'RECENTDOCUMENT' & '$USERID' FOLDERS EXIST IN THE CONTENT SERVER | ||
34375164 | BP- UNABLE TO SAVE CHANGES WHEN ADDING OR CHANGING VALUES ON A PROJECT CODE | ||
34354784 | FP - BUG 34274585 - RESOURCE ASSIGNMENT EXPORT SHOWS DIFFERENT CURRENCY FOR PRICE/UNIT | ||
34242601 | GET USAGE DATA NOT WORKING FROM APPLICATION SETTINGS > ENTERPRISE DATA > ACTIVITIES > ACTIVITY CODES - GLOBAL, INSTEAD A BLANK PAGE RESULTS | ||
34231721 | CANNOT LOAD RESOURCE / ASSIGNMENT VIEW | ||
33188267 | PRE- PROJECT CALENDARS, RESOURCE CALENDARS ARE NOT SORTING PROPERLY IN ENTERPRISE DATA | ||
TM | 34416894 | 21 BP - REJECTED STATUS UPDATE DOES NOT ALLOW UPDATE IN ACTION REQUIRED TAB IN MOBILE APP | |
34334333 | PROJECTS/ACTIVITIES NOT DISPLAYING IN TEAM MEMBER FOR SOME USERS | ||
SRVS | 34404398 | PROJECT PUBLICATION CAN CREATE A 'JT_RSRCROLESPREAD' JOB WHEN A PENDING/RUNNING JOB ALREADY EXISTS FOR THE PROJECT | |
INTG | 34395231 | 21 FP - WHEN RUNNING CREATES USING P6 WEB SERVICES THERE IS OFTEN NO WAY TO DETERMINE WHICH RECORD IS CAUSING AN ERROR | |
P6PRO | 34423246 | [SQL SERVER ONLY] UACCESS_MAINTAIN_FOR_USER STORED PROCEDURE EXECUTION TAKING 2+ MINUTES PREVENTING P6 PROFESSIONAL LOGIN | |
33460517 | SCRIPTING ERRORS WHILE LOADING IDP LOGIN PAGE WHEN CONFIGURED FOR SAML SSO | ||
34393231 | PROJECT LAYOUT IS NOT IMPORTED WHEN IMPORTING XML FILE IN ZIP FILE | ||
34389907 | CHANGES IN PHYSICAL PCT DOESN'T SHOW IN PREVIEW CHANGES ON MERGING REFLECTION | ||
34373555 | SCROLL OPTION ISSUE WHILE SELECTING THE PROJECT IN P6 VISUALIZER | ||
34043496 | CLICKONCE DEPLOYMENT UTILITY FAILS WITH UNEXPECTED ERROR AFTER FIRST EXECUTION OF SIGNTOOL.EXE WHEN USING WINDOWS SDK VERSION >= 10.0.20348.0 | ||
29707082 | PROJECT PASTED INTO RESTRICTED EPS NODE WHEN NO GROUPINGS ENABLED | ||
34432287 | UNABLE TO IMPORT MICROSOFT PROJECT XML INTO P6 PROFESSIONAL (PPM) | ||
34390085 | EARNED VALUE FIELDS NOT IMPORTED VIA XML IMPORT INTO SQLITE DATABASE |
Patch 21.12.7.0
Version | Component | Bug ID | Title |
21.12.7.0 | WEB | 34329392 | USER IS ABLE TO WITHDRAW THE APPROVED TIMESHEET IN TM |
34327128 | INTERNAL-FP:RESOURCE ANALYSIS - COLOR ASSIGNED IN LEGEND DOES NOT MATCH CHARTS | ||
34310611 | SLOW PERFORMANCE WHEN RUNNING MIGRATE.BAT (USING EITHER DATABASE MIGRATION OR SCHEMA MIGRATION OPTIONS) TO A SQL SERVER TARGET DATABASE- 21.12.X | ||
34214389 | 21 FP - PRE-SEARCH FOR ISSUE CODE VALUES NOT WORKING IN ISSUES VIEW | ||
34214373 | 21 FP - CORRUPTION / HTML REPLACEMENT DURING DOWNLOAD OF QUOTATION CHARACTERS FROM ISSUES PAGE (DESCRIPTION) | ||
33963723 | ADD PROJECT FROM EXISTING PROJECT AND PASTING INTO SAME OR DIFFERENT EPS NODE RESULTS IN ONE SPECIFIC ACTIVITY CODE (KPI) NOT BEING COPIED | ||
TM | 34302435 | ERROR COM.FASTERXML.JACKSON.CORE.JSONPARSEEXCEPTION: INVALID UTF-8 START BYTE 0XB4 WHEN TRYING TO MARK A STEP COMPLETE | |
34284007 | 21 BP - REJECTED STATUS UPDATE DOES NOT DISPLAY IN ACTIVITY OWNER'S ACTION REQUIRED TAB IF UPDATE WAS FOR AN ACTIVITY RESOURCE ASSIGNMENT AND PROJECT ONLY HAS THE ACTIVITY LEVEL STATUS UPDATE PREFERENCE ENABLED | ||
34203009 | 21 BP - LOADING APPROVAL PAGE WITHIN P6 MOBILE CAUSING FORCEFUL LOGOUT WHEN TEAM MEMBER STATUS REVIEWS ARE ENABLED FOR A PROJECT WITHOUT ASSIGNED REVIEWERS | ||
34072773 | LOADING ACTIVITIES AFTER TEAM MEMBER LOGIN TAKES LONGER TIME | ||
SRVS | 34277813 | FP - BUSINESS FLOW MIGRATE PROJECT DATA FROM P6 TO PRIMAVERA CLOUD FAILS DUE TO SPECIAL CHARACTER | |
34060167 | PROJECT PUBLICATION NOT HONORING THE PUBLICATION PERIOD START DATE AND ROLLING FINISH DATE FOR STORING TIME-DISTRIBUTED DATA | ||
INTG | 34288790 | BP BUG FOR - BUG 34260380 - ESCAPE CHARACTERS FOUND WITHIN OPENAPI.JSON FIELD DESCRIPTION | |
34288738 | BP - BUG 34260961 - VARIOUS TYPOS ON FIELD NAMES THROUGHOUT OPENAPI.JSON | ||
34209634 | FP - USING P6 WS CANNOT CREATE A UDF ON AN ACTIVITY STEP TEMPLATE ITEM | ||
P6PRO | 33923028 | ENDING WITH ACTIVITY SELECTED FOR CALCULATE MULTIPLE FLOAT PATHS RETAINED AFTER CHANGING DEFAULT PROJECT | |
34327217 | INTERNAL-FP:WHEN USING THE RESOURCE ANALYSIS TAB IN P6 EPPM WEB, THERE IS A DELAY IN DELETING A NAME THAT WAS FOUND USING GROUP BY RESOURCE CODE AND NAME | ||
34282922 | GLOBAL CALENDAR LINKS TO DEFAULT CALENDAR CHECK-OUT/CHECK-IN PROCESS | ||
34282787 | BASELINE IS NOT UPDATING AS EXPECTED | ||
34232093 | UNABLE TO CHANGE RESOURCE CODE VALUE FROM DETAILS PANEL->CODES TAB | ||
34209123 | 21 FP - USER UNABLE TO IMPORT THE XML FILE | ||
34201113 | P6 XML IMPORT RESULTING IN FAILED IMPORT JOB AND VIEW LOG ERROR SEVERE: ROW NUMBER IS OUT OF THE RANGE(1) | ||
33957538 | XLS IMPORT ADDS NEW RESOURCE WHEN RESOURCE ID IS NUMERIC WITH HEIRARCHY | ||
34316758 | BUG FIXES AND ENHANCEMENTS FOR 21.12.7.0 |
Patch 21.12.6.0
Version | Component | Bug ID | Title |
21.12.6.0 | WEB | 34223794 | BUG 34219132 - SPREAD TASK REQUIRES CALLING LOGIN TASK PRIOR WHEN AUTHENTICATION MODE IS SET TO OAUTH. |
34208075 | INTERNAL-FP:SOME RESOURCES, WHICH ARE NOT OVERALLOCATED, HAVE AN EXCLAMATION MARK RIGHT NEXT TO THEIR RESOURCE ICONS | ||
34196506 | BP-LOADING ASSIGNMENTS VIEW WITH A UDF COLUMN AS A NON-SUPERUSER EXECUTES STATEMENT TO LOAD ALL PROJECT AND WBS ELEMENTS WHICH CAN TRIGGER A DELAY IN SEVER SIDE CODE EXECUTION | ||
34179151 | 21 BP - P6 EPPM APPROVALS > STATUS UPDATES TAB NOT LOADING WHEN PENDING CONSTRAINT DATE CHANGE EXISTS BUT CONSTRAINT WAS REMOVED FROM ACTIVITY | ||
34164143 | 21 FP - SET PROJECT PREFERENCES AT THE EPS NODE, THE SETTINGS ARE NOT BEING FULLY APPLIED TO THE PROJECTS UNDER THE NODE | ||
34018389 | ACTUAL LABOR UNITS ARE RESET TO ZERO AFTER SCHEDULE (F9) IN P6 PROFESSIONAL | ||
TM | 34192816 | TEAM MEMBER NOT WORKING WHEN USING SSL DATABASE CONNECTION - IO ERROR: RECEIVED FATAL ALERT: HANDSHAKE_FAILURE | |
SRVS | 34174623 | FP - IMPORT PRIMAVERA XML FAILS FOR SQL SERVER VIA WEBSERVICES | |
34173923 | ERROR ON PRIMAVERA WEB SERVICE | ||
P6PRO | 34100325 | CONSTRAINT DATE TIME REVERTS TO 00:00 | |
34003439 | UNEXPECTED CENTURY DATE DISPLAYED WHEN USING 2-DIGIT YEAR | ||
34198485 | 21 FP - UTF-8 IS GETTING ADDED TO NOTEBOOK DESCRIPTIONS AFTER XML IMPORT | ||
34179563 | INTERNAL-FP:FAILED TO LOAD IMPORTOPTIONSTEMPLATE DATA WHEN IMPORTING PRIMAVERA XML | ||
34169582 | AFTER UPGRADE FROM VERSION 16.1 TO 20.12, CURRENT WEEK (CW) FILTERS ARE DEFECTIVE | ||
34123354 | EXPECTED FINISH CHANGES AUTOMATICALLY WHEN IT IS SELECTED | ||
33947353 | [ALL ENV] PUBLISH ENTERPRISE DATA RESOURCES OPTION DISABLED AFTER UPGRADE ALWAYS | ||
34119816 | VTFIO-0682-C WHEN CREATING A REFLECTION |
Patch 21.12.5.0
Version | Component | Bug ID | Title |
21.12.5.0 | WEB | 34155470 | GROUPING BY INTERVAL SHOWS NO DATA |
34115700 | INTERNAL-BP:REG 22.5: EPS VIEW- PROJECT BASELINE AND BASELINE DATA DATE COLUMNS NOT DISPLAYING CORRECT VALUES WHEN MORE THAN 500 PROJECTS | ||
34100534 | APPLY ACTUALS NOT WORKING IN P6 WEB | ||
34098919 | PRE : PSS - IMPORT PROJECT WITH HAVING SINGLEQUOTE IN THE IMPORTFILENAME , THROWS VALIDATION ERROR | ||
34084195 | FILTERS THAT CONTAIN DATES BRING BACK UNEXPECTED RESULTS | ||
34036571 | JAVASCRIPT CODE CAN EXECUTE THE /P6/REST/DICTIONARIES/LOAD/FINANCIALPERIODS REQUEST PASSING AN INVALID PARAMETER VALUE TEMPLATEID=UNDEFINED | ||
34032030 | 21 FP - AFTER UPGRADE FROM VERSION 16.1 TO 20.12, CURRENT WEEK (CW) FILTERS ARE DEFECTIVE | ||
34017083 | PUBLISH JOB CRASH WHEN IT LOADS A HALF DELETED PROJECT WITH NULL PROJWBS DATA | ||
33990010 | CLICKING ACCEPT, REJECT, OVERRIDE, HOLD ON THE APPROVALS > STATUS UPDATES PAGE TRIGGERS A FULL DATA RELOAD WITH THE SAVE OPERATION POST REQUEST | ||
33934925 | PRE:OBS FOR WHICH USER DOESNT HAVE ACCESS CAN BE ASSIGNED AT WBS LEVEL WHILE IMPORTING A PROJECT | ||
33810014 | GLOBAL SEARCH AND REPLACE FAILS - THE CONVERSION OF THE DATA TYPE VARCHAR TO DATETIME PRODUCED AN OUT-OF-RANGE VALUE. | ||
33784989 | INEFFICIENT STATEMENT LOADING PROJECTS > EPS PAGE WHEN PROJECT BASELINE COLUMN ADDED TO GRID AND ENVIRONMENT HAS THOUSANDS OF PROJECTS WITH A DEFINED PROJECT BASELINE | ||
TM | 34015547 | FP - BUG 33909508 - PERCENT COMPLETE VALUE IN TEAM MEMBER CHANGE WHEN SAVED INITIALLY | |
SRVS | 34072158 | WEB SERVICES READRESOURCEASSIGNMENTSPREAD NOT WORKING | |
P6PRO | 34166600 | XER IMPORT/EXPORT NOT IMPORTING OR EXPORTING CALENDAR EXCEPTIONS, NOTEBOOK DESCRIPTIONS WHEN DATA ELEMENT EXCEEDS 4096 CHARACTERS | |
34094396 | FP - [ORACLE DB ONLY] UPGRADE SCRIPT LOGIC FROM 20.9 OR EARLIER RELEASES CAN CREATE FINANCIAL PERIOD WITH END_DATE THAT INCLUDES A TIMESTAMP OTHER THAN 00:00:00 | ||
34084187 | BASELINE UPDATE PERFORMANCE ISSUE | ||
34084170 | WRONG ADDED BY USER APPEARING FOR MULTIPLE PROJECTS, CUSTOMER REQUESTING HOW/WHO MADE ADDED BY CHANGES | ||
34076716 | PPM JOB SERVICES FAILS XER EXPORT JOB - ERROR: ACCESS VIOLATION AT ADDRESS 0000000000F5657C IN MODULE ~PRMJOB.EXE~ | ||
34070223 | P6 IS DISABLING THE MENU FOR NON-INTEGRATED PROJECTS AND NOT ENABLING IT AGAIN | ||
34067946 | IMPORT XML FAILS WITH ERROR ORA-00001: UNIQUE CONSTRAINT ADMUSER.PK_TASK VIOLATED | ||
34056584 | SQL SERVER DB UPGRADE FROM 20.12.2.0 TO 21.12.3.0 FAILS - ERROR IN RUN SQL SCRIPT SSPM_P201202.SQL | ||
34049701 | LONG START OF P6 PROFESSIONAL APPLICATION. | ||
34032447 | NON-ADMIN SUPERUSERS GETTING AN EXCEPTION ERROR WHEN ATTEMPTING TOOLS, SCHEDULE COMPARISON IN PVD | ||
34006566 | IMPORTING XER IS NOT DELETING ALL UNREFERENCED ACTIVITY RELATIONSHIPS |
Patch 21.12.4.0
Version | Component | Bug ID | Title |
21.12.4.0 | WEB | 34015228 | CLICKING STATUS APPROVAL 'ACCEPT ALL' BUTTON FOR A PROJECT DOES NOT WORK AFTER PREVIOUSLY CLICKING 'REJECT' AND 'ACCEPT' FOR TWO OTHER CARDS |
34011789 | CONTAINS FUNCTION NOT WORKING FOR FILTERED PORTFOLIO | ||
33990132 | BP - IMPORT XML RUNS FOR LONG TIME AND OFTEN FAILED WITH TIME OUT | ||
33985491 | 21 FP - SCHEDULED SUMMARIZATION ERROR: THE VALUE OF ATTRIBUTE TITLE ASSOCIATED WITH AN ELEMENT TYPE DIV MUST NOT CONTAIN THE '<' CHARACTER. | ||
33982735 | RESET USER PREFERENCES DELETES THE ASSIGNED USER INTERFACE VIEW PAGE/MENU OPTIONS (REENABLING ALL OPTIONS) & TRIGGERS THE RESET OF USER PREFERENCES FOR ANY USER MODIFICATION DURING REMAINDER OF THE USER'S SESSION | ||
33966620 | ERROR WHEN FORMULA INDICATOR PROJECT UDF HAS DISPLAY DATA VALUE UNCHECKED: <UDF> - THIS IS A REQUIRED FIELD. | ||
33965184 | PROJECT PREFERENCES DO NOT SAVE IF SET AT THE EPS LEVEL. | ||
33940603 | NEED SECURITY SETTING TO DISABLE RENUMBER SELECTED ACTIVITIES IN BASELINES | ||
33925706 | RUN REPORTS PAGE LOADS HTML STRING IN PARAMETER FIELD AFTER SELECTING A RESOURCE | ||
33919342 | FP - BUDGETED VALUES ARE NOT SHOWING CORRECTLY ON PORTFOLIOS | ||
33919325 | FP - JOB_LOG_DATA ENCRYPTED WITHIN REDHAT ENTERPRISE LINUX 7 | ||
33916474 | ERROR: UNABLE TO EDIT VIEW FROM ASSIGNMENT PAGES (BOTH PROJECT AND RESOURCE) | ||
33597056 | IN PROJECTS TAB/EPS PAGE WHEN GROUPED BY EPS TO LEVEL 1 THE EPS' SHOWN ARE TO THE LOWEST LEVEL EPS AND NOT THE HIGHEST LEVEL EPS (LEVEL 1) | ||
33519258 | IDENTIFY/REMOVE SQL REDUNDANCY ACROSS REQUESTS AND/OR CONSIDER PARALLEL EXECUTION OF REST CALLS TO IMPROVE OVERALL LOAD TIME OF ACTIVITIES PAGE | ||
TM | 34001723 | TEAM MEMBER LAST_ACTIVE_TIME AND LOGIN_DATE ALWAYS IDENTICAL | |
SRVS | 34010883 | FP - P6 WS FAILS WITH DBNGINE.PREPARESTATEMENT: CONNECTION OBJECT IS NULL. WHEN UPDATING ACTIVITY FEEDBACK | |
P6PRO | 33962047 | FP - XML IMPORT UPDATE EXISTING NOT UPDATING WBS NAME CHANGE | |
33961600 | IMPORT TAKES MULTIPLE HOURS FOR CERTAIN XER FILES | ||
33875048 | XML EXPORT WITH BASELINE FAILED SQL SERVER | ||
33855556 | CLOUD CONNECT CONNECTION STRING IS NOT ENTIRELY VISIBLE | ||
33847390 | TIMESTAMP ON ACTUALS IN P6 PRO SHOWS 1 MINUTE EARLIER THAN TIMESTAMP ON ACTUALS IN XLS IMPORT | ||
33989922 | 404 ERROR INCOMPLETE URL SHOWS WHEN CALLING P6 REST API | ||
33952647 | ENABLE SECURITY PROMPTS TO DISPLAY WITHIN SSO EMBEDDED BROWSER WHILE SUPPRESSING JAVASCRIPT EXCEPTIONS |
Patch 21.12.3.0
Component | Bug ID | Title |
WEB | 33928865 | INTERNAL-FP:BASELINE ASSIGNMENTS LOST AFTER IMPORTING PRIMAVERA XML |
33865090 | ENABLE USERNAME TOKEN BASED AUTHENTICATION IN P6 PRIMAVERA CONNECTOR 20.12 | |
33899265 | 21 FP - NOTHING HAPPENS WHEN CLICKING APPLY BUTTON IN PROJECT NOTEBOOK DISCRIPTION EDIT PAGE | |
33840366 | LAST_RECALC_DATE DATA DOES NOT MATCH WHAT IS SHOWN IN P6 | |
33837182 | ERROR: USER DOES NOT HAVE LICENSE OF TYPE WEB_PM WHEN ACCESSING ACTIVITIES PAGE AS CONTRIBUTOR | |
33830633 | APPROVALS > STATUS UPDATES PAGE EXECUTING INEFFICIENT INCORRECT TASKACTV/UDFVALUE STATEMENTS | |
33795687 | CANNOT CLEAR REJECTED STATUS UPDATE | |
33865509 | UNEXPECTED RESULTS IN THE WBSHIERARCHY TABLE IN REFERENCE TO THE PARENTLEVELSBELOWROOT AND CHILDDLEVELSBELOWROOT COLUMNS | |
P6PRO | 33917649 | ERROR ORA-01400: CANNOT INSETT NULL INTI ADMUSER.FILTPROP.TABLE_NAME WHEN SAVING LAYOUT AS USER LAYOUT |
33837972 | CONFLICTING SCHEDULE OPTIONS PROMPT AFTER ENABLING/DISABLING THE LOG TO FILE PARAMETER THEN SCHEDULING MULTIPLE OPEN PROJECTS | |
33699424 | AVAA0 ERROR WHILE OPENING A SPECIFIC LAYOUT WITH MULTIPLE PROJECTS SELECTED | |
33643321 | COPY/PASTE A BIG PROJECT IS SLOW IN PPM - SQL DATABASE | |
32996854 | TOTAL ACTIVITY COUNT IN WBS VIEW NOT UPDATED CORRECTLY | |
33911158 | XER IMPORT ERROR CVRCV WHEN IMPORTING XER WITH DUPLICATE RESOURCES | |
33889967 | XML IMPORT - (ADMUSER.FK_OBSPROJ_OBS) VIOLATED - PARENT KEY NOT FOUND | |
33865350 | GROUPING ACTIVITIES BY START DATE WITH DAY INTERVAL IN P6 PROFESSIONAL SHOWS INCORRECT DATE FORMAT | |
33835991 | UDF FIELDS APPEARING IN XER THAT DO NOT EXIST IN DATABASE | |
33820402 | IN P6 PRO THE RESOURCE USAGE PROFILE OPTIONS SECTION FOR RESOURCE FILTER / GROUP NAMES ONLY SUPPORTS UP TO 50 UNIQUE FILTER GROUP NAMES | |
33794884 | MSP TEMPLATE CREATES INVALID NOTES TAG FOR MSP XML EXPORT THAT CAUSES FILE CORRUPTION | |
33794479 | EMPTY WBS NODE BECOMES AN ACTIVITY WHEN EXPORTED TO MSP XML | |
33794438 | CODE LEVEL CHANGES FOR BUG 33552097 - HELP WITH MOVING ACTIVITY CODES AND CALENDARS FROM GLOBAL/EPS LEVEL TO PROJECT LEVEL | |
33760203 | UNABLE TO DEFINE CRITICAL ACTIVITIES IN VISUALIZER | |
33714195 | P6 PROFESSIONAL UNABLE TO CONNECT DATABASE ERROR WHEN WINDOWS REGIONAL SETTING SET TO TURKISH | |
33605603 | USING P6 PROFESSIONAL CLICKONCE STAGE ENVIRONMENT, AFTER OPENING PROJECT FOLLOWED BY CLOSE ALL RESULTS IN AVAA0 ERROR |
Patch 21.12.2.0
Component | Bug ID | Title |
WEB | 33823000 | FP - WHY ARE THE PRIVILEGES REQUIREMENTS DIFFERENT BETWEEN CLIENT AND WEB WITH REGARD TO COPYING A READ-ONLY PROJECT? |
33817665 | FP - ACTIVITY PAGE GRIDDATA/LOAD STATEMENT LOADING PROJECTS WITH TWO TASK TABLE SUBQUERIES CAUSING PERFORMANCE DEGRADATION | |
33813108 | FP - DIFFERENT RESOURCE MANAGER CAN APPROVE TIMESHEET BY SWITCHING VIEWS IN APPROVAL PAGE | |
33799002 | 21 FP - DELETED RELATIONSHIPS REAPPEAR AFTER RELATIONSHIP CHANGES SAVED | |
33794393 | MSP PROJECTS IMPORT INTO P6 WITH PERCENT COMPLETE TYPE SET TO PHYSICAL EVEN THOUGH IT IS SET TO DURATION ( % COMPLETE) IN MSP | |
33794370 | RISK RESPONSE PLAN WILL NOT STAY ACTIVE | |
33794344 | TIMESHEET TOTALS IN P6 WEB NOT SHOWING TOTALS FOR FIRST OR LAST DAY OF TIMESHEET PERIOD | |
33787780 | 21 FP - DUPLICATE PROJECT CODES WHILE IMPORTING XML USING NEW NAME FEATURE IN IMPORT TEMPLATE | |
33780137 | PROJECT CODE VALUES BLANK WHEN MULTIPLE PROJECTS OPENED IN EPS PAGE | |
33765614 | FULL PATH NAME IN RESOURCEHIERARCHY TABLE ARE NOT CORRECT | |
33751376 | REG-FILLDOWN AN EMPTY VALUE WITHOUT SAVING IS NOT HAPPENING | |
33730716 | [JAVASCRIPT] ACTIVITY PAGE LOADING DELAY WITH VIEW USING WBS GROUPING AND PROJECT WITH HUGE VOLUME OF WBS ELEMENTS | |
33797582 | ACTIVITY LEVEL PROJECT SECURITY PRIVILEGE 'DELETE DISCUSSION COMMENTS' IS NOT EXPOSED IN P6 WEB SERVICES | |
33730609 | ORPM_ADMUSER_UPGRADE.SQL CAN FAIL WITH ORA-00439: FEATURE NOT ENABLED: ONLINE INDEX BUILD WHEN RUN AGAINST AN ORACLE STANDARD EDITION DATABASE | |
TM | 33788481 | BASELINE DATES DON'T SHOW IN TIMESHEETS FOR ACTIVITIES THAT WERE AUTOMATICALLY ADDED |
SRVS | 33763857 | FP - CUSTOMER WIPED PAUDITX BUT WHEN AUDIT DATA IS REPUBLISHED IT ONLY TOOK AUDIT DATA FROM THE DAY OF THE REPUBLISH |
P6PRO | 33844667 | P6 PROFESSIONAL LINK TO UNIFIER THROWS ERROR 'NF(-'-3940-8 NOT FOUND (404) |
33667966 | THE 'ACTIVITY RESOURCE ASSIGNMENTS' STAGE OF AN XER IMPORT TAKES ABOUT 80% OF THE TOTAL IMPORT TIME. | |
33654104 | ROW HEIGHT CHANGES NOT WORKING CORRECTLY. |
Patch 21.12.1.0
Component | Bug ID | Title |
WEB | 33748157 | FAILED TO LOAD AVESAPI.PROPERTIES AS A CLASSLOADER RESOURCE WHEN UPGRADING FROM 21.12TO 21.12.1 |
33717305 | FP - INVALID PATH WAS REQUESTED WHEN OPENING BUBBLE CHART WITH LABOR UNITS MORE THEN 999 HOURS FOR RUSSIAN | |
33685213 | HIERARCHICAL ASSIGNMENT CODE VALUES NOT RETAINED AFTER SAVE IF APPLIED VIA FILL DOWN | |
33673745 | USING FILL DOWN IN P6 WEB TO UNCHECK ENABLE SUMMARIZATION PRODUCES SEVERAL POPUPS | |
33662844 | FP DOWNLOAD FILE FROM NOTIFICATION WINDOW DOES NOT WORK WHEN ATTEMPTING TO DOWNLOAD A REPORT | |
33658376 | INTERNAL-FP:NULL FOR FINISHDATE IN P6BLPROJECT, NULL FOR STARTDATE AND FINISHDATE IN P6BLWBS | |
33657218 | RECENT USER ACTIVITY VIEW DOES NOT POPULATE THE COLUMN DATA - SQL SERVER DB | |
33618878 | FP - PORTFOLIO VIEW SCORECARD PORTLETS FAILING TO LOAD WITH JAVA.LANG.NULLPOINTEREXCEPTION POST UPGRADE FROM 19.12.X | |
33615630 | 21 FP - EXPORT LANGUAGE IS DIFFERENT THAN LANGUAGE SELECTED DURING LOGIN. | |
33610271 | RESOURCE ASSIGNMENTS VIEW NOT GROUPING BY HIERARCHY IN P6 WEB | |
33560111 | FP BUG 33390566 - COULD NOT FIND THE CONTEXT WBS FOR SECURITY CHECKING. {1} MIGHT NOT EXIST. | |
33546668 | GLOBAL SEARCH AND REPLACE ONLY USES FIRST VALUE IN THE COMMA SEPARATED VALUES | |
33539485 | PORTUGUESE LANGUAGE TRANSLATION NOT 100% ON PROJECTS TAB, EPS PAGE AND ACTIONS MENU ITEMS | |
TM | 33532370 | IF A SUBMITTED STATUS UPDATE IS REJECTED AND THE SAME ACTIVITY (W/ REJECTED STATUS) IS VIEWED IN ACTIONS REQUIRED PAGE THE ERROR - TEAMMEMBER_ERROR_GENERIC DISPLAYS |
33497414 | STATUS UPDATES FOR REMAINING DURATION AND PERCENT COMPLETE RESETS ORIGINAL DURATION | |
SRVS | 33565049 | DUPLICATE SUMTASK ROWS CAN CAUSE PROJECT PUBLICATION STEP 34 TO FAIL WITH ORA-00001: UNIQUE CONSTRAINT (ADMUSER.PK_PROJECTX) VIOLATED |
33732400 | FP - AFTER UPGRADING TO 20.12.9 P6 WS FAILS WITH ERROR THE MESSAGE CANNOT BE PROCESSED BECAUSE IT HAS EXPIRED | |
33638813 | FP - P6 WEB SERVICES READACTIVITIES FAILS WHEN INCLUDING BASELINE FIELDS | |
33717259 | P6 WEB SERVICE RETURNS A GENERAL ERROR WITHOUT STACKTRACE | |
33628234 | 21 FP - PROJECT LASTUPDATEDATE HAS DIFFERENT VALUES BETWEEN P6 WEB SERVICES AND PDS / PX. | |
33621970 | DELETERESOURCEASSIGNMENTPERIODACTUALS RETURNS A GENERAL ERROR WITHOUT STACKTRACE | |
33618858 | FP - TEMPLATEWBSOBJECTID PARAMETER FROM PROJECTSERVICE > COPYWBSFROMTEMPLATE OPERATION ALLOWS A WBS_ID VALUE FOR A NON-TEMPLATE PROJECT OR EPS | |
P6PRO | 33679335 | AFTER THE UPGRADE USER CAN'T SELECT OPTION FROM PAGE SETUP. |
33661180 | LAYOUT ELEMENTS FAIL TO DRAW AS SELECTED | |
33449361 | UNEXPECTED CENTURY DATE DISPLAYED WHEN USING 2-DIGIT YEARS IN THE FUTURE FOR CONSTRAINTS DATE DIALOG BOX | |
33389489 | P6 PROFESSIONAL APPLICATION FREEZES WHILE LOADING PROJECT LEVEL LAYOUTS WHEN PROJECT LAYOUT CONTAINS TOTAL COST COLUMNS | |
33674509 | ENABLE PUBLICATION SETTING IS DISABLED AFTER MERGING REFLECTION PROJECT INTO SOURCE PROJECT | |
33664528 | ERROR EXPORT PROJECT XML | |
33649339 | IMPORT EXCEL XLSX FAILS WHEN UPDATING MILESTONES RELATIONSHIPS | |
33640853 | THE APPLICATION DOESN'T RESPOND WHEN IT IS OPENED ON THE SECONDARY MONITOR. | |
33615739 | 21 FP - PERIOD DATA AT ACTIVITY LEVEL LOST WHEN COPY/PASTING PROJECT | |
33593367 | FP XML IMPORT IS VERY SLOW | |
33471845 | EMPTY EPS NODES HIDDEN WHEN ADDITIONAL GROUPING CRITERIA IS USED | |
33422096 | AVAA ERROR IMPORTING ACTIVITIES FROM EXCEL | |
33378497 | EVENT CODE: LIOOB-3638-4 WHEN IMPORTING AN XML WITH MULTIPLE BASELINES | |
33723294 | SQLITE DATABASE(S) UNABLE TO UPGRADE TO 21.12 | |
ADMIN | 33654138 | FP - UPGRADE SCRIPT MISSING LOGIC TO CREATE NDX_PROJWBS_1 AS A LOCAL INDEX IF PARTITIONING ENABLED |
33708508 | FP - UNABLE TO CONNECT DATABASELOGINS TOOL TO SQL SERVER WITH ENCRYPTED CONNECTION |
Primavera P6 EPPM 21.12.X Patch/Update(补丁/更新)相关推荐
- Primavera P6 EPPM 19.12.X Patch/Update(补丁/更新)
目录 Patch 19.12.18.0 Patch 19.12.17.0 Patch 19.12.16.0 Patch 19.12.15.0 Patch 19.12.14.0 Patch 19.12. ...
- Primavera P6 EPPM R17.12.X Patch/Update(补丁/更新)
目录 Patch 17.12.20.0 Patch 17.12.20.0 Patch 17.12.19.0 Patch 17.12.18.0 Patch 17.12.17.0 Patch 17.12. ...
- Primavera P6 EPPM 20.12.X Patch/Update(补丁/更新)
目录 Patch 20.12.13.0 Patch 20.12.12.0 Patch 20.12.11.0 Patch 20.12.10.0 Patch 20.12.9.0 Patch 20.12.8 ...
- Primavera P6 EPPM R18.8.X Patch/Update(补丁/更新)
目录 Patch 18.8.25.0 Patch 18.8.24.0 Patch 18.8.23.0 Patch 18.8.22.0 Patch 18.8.21.0 Patch 18.8.20.0 P ...
- Primavera P6 EPPM R8.3.X Patch/Update(补丁/更新)
目录 Patch 8.3.15.0 Patch 8.3.13-14.0 Patch 8.3.12.0 Patch 8.3.11.0 Patch 8.3.10.0 Patch 8.3.9.0 Patch ...
- Primavera Unifier 19.12.X Patch/Update(补丁/更新)
了解本文内容前,可以先读之前的关于patch的文章,希望可以给你带来帮助 Oracle Primavera P6 & Unifier等产品 Patch 补丁介绍_Oracle Primaver ...
- Primavera P6 Professional 21.12 登录异常案例分享
前不久一个好友咨询P6 Professional 登录异常的问题,因该问题比较特殊,现分享给大家,希望为遇到类似问题的同行/用户提供参考 先介绍P6安装基本信息: APP服务器(App):Weblog ...
- 分享一套Oracle P6 PUGateway 21.12 Linux虚拟机
根据一行业同事请求,这两天整了一套针对于Primavera P6,Unifier 用Gateway对接的虚拟机 操作环境为Oracle Linux: 已通过virualbox 导出虚拟机ova,感兴趣 ...
- Primavera P6 Professional R21.12 正式发布(附下载地址)
终于,在平安夜这一天,Oracle正式上架了的Primavera P6 Pro软件的21.12版本, 这将是未来一年在Oracle软件分发平台上能够检索到的最新的版本,查看了官方文档,本次更新更多是易 ...
最新文章
- 【django轻量级框架】Django项目导入css,js,images等静态文件
- MS Vs.net 2003 Sp1发布!
- java 程序执行后 强制gc_GC 设计与停顿
- 如此生猛的纪录片,背后是难以置信的故事!
- 星光计划计算机,上海星光计划第七届职业院校技能大赛.PDF
- 计算机网络学习笔记-1.1.3-速率相关的性能指标
- object转float_人工智能-Object Detection API 模型转tflite并验证
- zoj 2526(一道很好的最短路应用题)
- C++11 double转化为string
- add_subplot()--matplotlib
- IOS 视屏开发之AVPlayer的基本使用
- 神舟微型计算机登录密码忘记,win10开机密码忘记按f2(win10忘记密码强制重置)
- 在桌面计算机找不到光盘驱动,驱动程序存放在Windows7系统光盘的哪 – 手机爱问...
- ftp服务器管理网页,ftp服务器 web管理工具
- 高等学校计算机一级考试题库,全国计算机一级考试题库「附答案」
- 华为路由器GRE隧道配置
- java 将对象置空_Java 中将对象引用置 null 的作用?
- 关键词细分优化的策略方法
- 【无人机】【2015.01】无人机的容错飞行控制研究
- python爬虫—关于淘宝商品的爬取
热门文章
- Cty的Linux学习笔记(十四)
- 2020ICPC上海 D Walker(思维、二分、三分)
- matlab 怎么求mape,如何有效地计算MATLAB中神经网络应用中训练/测试集的MAPE?
- RT Thread利用STM32CUBEMX和RT Thread studio来创建模板工程
- 陌陌、狼人杀等这些爆火的应用,都是啥技术搞得?
- 五步准备一份漂亮的Java简历!
- 申请保密局涉密系统集成资质基本前提和共同性要求
- 话务预测(2) 数据
- Mapper method attempted to return null from a method
- ISO/OSI参考模型总结